Language
Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-08-23 00:38
91
chinalove(Ms.)
Beijing
No.1389,Zhujiang Road,Huangdao, Qingdao, Shandong, China (266555)
Solar panel | Type | Polycrystallinesilicon A-level | |||||
Power (Wp) | 1000 | 2000 | 3000 | 4000 | 5000 | 6000 | |
Solar module | 250Wp | 250Wp | 250Wp | 250Wp | 250Wp | 250Wp | |
Quantity (pieces) | 4 | 8 | 12 | 16 | 20 | 24 | |
Power/day (kWh) | 4 | 8 | 12 | 16 | 20 | 24 | |
Solar controller | Capacity | 24V/40A | 48V/40A | 48V/80A | 96V/60A | 96V/60A | 96V/70A |
Protection | overcharge/positive and negative reverse/reverse charging/lightning | ||||||
Stop charging | 27.4V | 54.8V | 54.8V | 115V | 115V | 115V | |
Recovery charge | 26.3V | 52.6V | 52.6V | 105V | 105V | 105V | |
Inverter | Output power (W) | 1000 | 2000 | 3000 | 4000 | 5000 | 6000 |
Inverter type | Low frequency or High frequency pure sine wave | ||||||
Output voltage | 110/127/220V ±5% | ||||||
Frequency | 50Hz/60Hz ±1% | ||||||
Waveform | (pure sine wave) THD <2% | ||||||
Phase | single phase/ three phase optional | ||||||
Working efficiency | >85% | ||||||
Working model | solar power first, if battery low switch to city power | ||||||
Switching time | city power to inverter 8m/s inverter to city power 6m/s |
||||||
Protection | DC under voltage/overload/short circuit/peak surge | ||||||
Battery | Batterytype | deep cycle maintenance-free lead-acid battery | |||||
Capacity(AH/12V) | 150 | 150 | 250 | 150 | 200 | 200 | |
Quantity (pieces) | 2 | 4 | 4 | 8 | 8 | 8 | |
Cable | 2.5 mm2 | 12m | 24m | 36m | 48m | / | 72m |
4mm2 | / | / | / | 120m | 60m | / | |
6 mm2 | / | / | 100 | / | 120m | 120m | |
10mm2 | 40m | 46m | 12m | 12 | / | ||
16mm2 | / | / | 6 | / | / | 12m | |
Cabinet | √ | √ | √ | √ | √ | √ | |
Combiner box | / | √ | √ | √ | √ | √ | |
Bracket |